| ORA-16217: | prepare to switchover has not completed | | Cause: | An ALTER DATABASE PREPARE TO SWITCHOVER command was issued, but the prepare activity did not complete. | | Action: | Verify that the standby was prepared properly. You may cancel the prepare and perform an unprepared switchover which requires a database link to complete. Or reissue the prepare operation on the standby.
|
|
|